Ensure the water supply for the 13th edition of the festival: Floralies Internationales. For this, 7x interconnected DECI tanks of 120 m3 were deployed (8/10 days of filling), giving a total storage capacity of 840,000 L (840 m3). For a little over 72 hours, 2 technicians took turns monitoring the tank filling operations. Other equipment was installed: 26 service water distribution poles, 11 grease separators including 2 of 1300 L, 36 IBC 1 m3 for rainwater recovery, 1 raft pump and 1 24 m3/h booster. WC Loc has set up: 83 dry toilets including racks, and 5 urine collection areas with the start-up TOOPI ORGANICS. The WC Loc and Waterlab Services teams were permanently technical and maintaining their respective installations.

Client

WATERLAB Services and WC Loc at the Floralies Internationales festival

For this project, the Vendée department called on Waterlab Services and WC Loc, brands of the Enygea Group.
The two subsidiaries demonstrated synergy, requiring numerous materials. Dry mobile toilets, installed by WC Loc, expert in mobile hygiene and DECI tanks, water fountains as well as static tanks installed by Waterlab Services, expert in temporary solutions for water needs.

Request

Storage, water supply and wastewater disposal

Ensure water needs while respecting the environment. The challenge: supplying water to the festival without drawing on the aquifer and causing water stress. For this, water storage started 4 months before the start of the event with DECI tanks. Water supply and storage to plant 300,000 plant plants. Collection of wastewater with static tanks. Installation of drinking water fountains. Service water distribution. Grease separator for catering. Rainwater recovery.

Un projet à nous confier ?
Contactez-nous !
Titre alternatif

⚡ Votre navigateur est obsolète ! ⚡

Mettez-le à jour pour voir ce site correctement.

Mettre à jour